BIG POOL 4, AUSTRIA
FACILITY

38 public schools in the federal state of lower Austria

Outdated and inefficient technical equipment

Motivating 1’250 classes with 30’000 students

COUNTRY Austria
CUSTOMER
TYPE OF BUILDING Public schools
GENERAL INFORMATION

Initial Situation

38 public schools in the federal state of Lower Austria were pooled together in a performance contracting project. Much of the technical equipment used in the schools was in a state of suboptimal performance and efficiency. In addition to implementing building performance improvements, approximately 1.250 classes with 30.000 students participated in the project “User Motivation for Energy-Conscious Behaviour”.

Goals of building owner

Lowering the operational costs

Reducing energy demand

Increasing the plant’s reliability

Raising awareness of students, teachers, and school staff

Introduction of a new energy management system to simplify the use of the system and to reduce the energy waste

IMPLEMENTED VIA ANDMEASURES IMPLEMENTED EPC
TYPE OF MEASURES Ten year energy savings contract, new regulation and control systems, individual room controls, application of reference detectors and thermostats, hydraulic equipment, damping and insulation of windows, condensing boiler and exhaust chiller, heat pumps and solar plants, heat recovery at ventilation systems, optimization of ventilation systems, energy efficient lighting, time switch towards stand-by, and energy metering.
CONTRACT DURATION 10 YEARS
ENERGY COSTS 2012 (BASELINE) 3.120.000 €/Y
GUARANTEED SAVINGS IN EURO 722.330.000 €/Y
GUARANTEED SAVINGS IN % 23.15 %
REDUCTION OF CO2-EMISSIONS > 2’880 T/Y
INNOVATIONS AND CLIENT’S ADVANTAGES

Lower operational costs

Increased reliability

Reduction of CO2-Emissions

Supporting management initiatives

User motivation

Preventing energy waste

Lowering energy demand

Supporting alternative energy

Creation of green jobs

Creation of energy analysis and benchmarks

Reduction of energy consumption and maintenance requirements

Customer support for a period of over 10 years

Extension of the contract by 10 years due to high customer satisfaction

Guaranteed savings were exceeded by several percentage points

The project had a great role model effect.

LEARN MORE ABOUT THIS PROJECT Deliverable D3.5: Report on existing performance contracting examples and energy service models.