COMPREHENSIVE RENOVATION IN BUILDINGS OF FEDERAL POLICE ST. AUGUSTIN, GERMANY
FACILITY Public buildings of Federal Police St. Augustin
COUNTRY Germany, St. Augustin
CUSTOMER Direct contracting entity is the BImA (Bundesanstalt für Immobilienaufgaben) and indirectly the Federal Police
TYPE OF BUILDING 84 buildings with a main floor space of 127,000 m²
GENERAL INFORMATION

The St. Augustin project provides an example of combining the technology measures implemented through EPC with the thermal envelope measures financed by the client.

The Bundespolizei (Federal Police Authority, FPA) commissioned Cofely to energetically optimize its facilities in Sankt Augustin, near Germany’s former capital Bonn. The BPA in St. Augustin is one of 9 regional FPAs in Germany, with about 3,500 police and administrative staff, and is responsible for all federal police assignments in the State of Northrhine- Westfalia. The site comprises 84 buildings with a main floor space of 127,000 m².

Cofely guarantees an energy cost reduction of 55% during the contract term of 10 years and will reduce local CO2 emissions by 5,200 tons per year. Direct contracting entity is the BImA (Bundesanstalt für Immobilienaufgaben) and indirectly the Federal Police, whose high security standards have to be observed. The contract is based on an energy performance contract bid issued by dena, the German Energy Agency. Main requirements of the contract: 50% of the heat are to be supplied carbon-neutral; energetic refurbishment of one building; reduction of energy consumption. Cofely developed a package of tailor-made measures for the optimization of heat and power supply, lighting systems, domestic hot water, building automation and metering technology as well as building reconstruction. To our best knowledge, this is one of the most comprehensive energy performance projects in Europe to date, with a high degree of technical complexity, an above-average energy savings guarantee of 55%, the integration of renewable energy sources and above all, the refurbishment of the building shell.

Cofely was awarded with the European Energy Service Award 2014 with reference to this project.

IMPLEMENTED VIA COMPREHENSIVE EPC FINANCED BY THE CLIENT
TYPE OF MEASURES Technology measures Thermal envelope measures
YEAR OF INSTALLATION MEASURES 2013 – 2025
CONTRACT DURATION 10 years
PERIOD OF PROVIDED GUARANTEES FOR ENERGY SAVINGS 10 years
INVESTMENT VOLUME EUR 6.3 milllion
TECHNOLOGY MEASURES IMPLEMENTED BY EPC EPC PROVIDER Cofely Deutschland GmbH
IMPLEMENTED MEASURES

    ─ Refurbishment of the building shell;

    ─ New heating supply with wood chips and gas boilers;

    ─ Cogeneration plant;

    ─ New building control system;

    ─ About 3,000 new luminaries, partly LED;

     ─ Hydraulic optimization;

     ─ Optimization of existing HVAC systems.

FINANCING

     ─ Funding source: Forfaiting i.e. the ESCO sells the future ESCO rates from client to the bank, which is providing the project financing.

     ─ Investment volume: EUR 6.3 million

THERMAL ENVELOPE MEASURES FINANCED BY THE CLIENT IMPLEMENTED MEASURES Refurbishment of the building shell
TYPE AND SOURCE OF FINANCING 100% of the costs of thermal envelope measures have been financed by the client
LEARN MORE ABOUT THIS PROJECT Deliverable D3.5: Report on existing performance contracting examples and energy service models.